Confirm what is moving
Clarify responsibility for furniture, appliances, toilets, doors, baseboards and existing flooring before the start date. Do not assume every item is included in the same scope.

Serving the Lower Mainland and surrounding areas
Good preparation reduces surprises and gives the installation team a safer, clearer work area.
Clarify responsibility for furniture, appliances, toilets, doors, baseboards and existing flooring before the start date. Do not assume every item is included in the same scope.
Arrange parking and a material path, secure pets, keep children away from the work area and identify building or strata rules that affect working hours.
The existing surface, moisture conditions, flatness, transitions and expansion requirements are reviewed before the visible installation begins. That early work helps prevent avoidable movement, unevenness and awkward edges.
Send a few details or call directly. Casper Flooring will review the project and help clarify the next step.